What is the installation form of curb stone

time:2021-12-28 11:04:44 Number of views:
Most of the curb stones are used for the pavement of the road edge, which can not only ensure the safety of pedestrians and vehicles, but also make the road edge neat and beautiful; And ensuring safety and beautifying the environment is really a good choice for architectural decoration. What we see in our daily life are paved kerbs. We don't know what kind of installation form of kerbs is. Let's talk about the installation form of kerbs
The forms of curb stones are vertical, inclined and flat. The paving of curb stone plays a role in ensuring the traffic safety of pedestrians and vehicles and ensuring the neat edge of the pavement. This paper understands the construction technology of curb stone from the trenching, installation of pavement base, covering and reinforcement of curb stone back, and summarizes the quality requirements and precautions of curb stone, so as to ensure the construction quality and improve the aesthetics of the road.
The kerb must be constructed by hanging through the line, which shall be tightened according to the elevation mark line on the top surface of the side plane, and the side platform shall be built according to the line. The side platform shall be upright, and shall not be lifted up and closed back. The side top line shall be straight, smooth and smooth, without high and low staggered teeth, and there shall be no up and down staggered platforms and internal and external staggered teeth on the plane.
1. When installing kerbs, some tools, such as hooks, are required for the installation of larger kerbs. Before the installation of curb stone, we first mix the mortar used, and put the curb stone at the laying position.
2. Then we hang the line at the construction site to determine the height and straightness of the curb. If there is no previous laying, a piece can be laid first and then hung as a standard.
3. After the line is hung, we use tools to clean the foundation trench to the required position.
4. Then put mortar or concrete under the curb and put it according to the drawing design.
5. Then two people hook the edge of the curb stone with a hook and slowly put the curb stone into the upper part of the mortar. The hook at the joint of the curb stone needs to hook both sides of the curb stone, and the other end hooks the end point to move the curb stone back and forth.
6. According to the hanging line, after placing the curb stone, we pat it gently to make it consistent with the height of the previous curb stone, and the installation is completed.
The installation form of curb stone is probably these contents. After understanding, do you no longer think that the laying of curb stone is simple? These have certain standards and must be implemented according to the standards. Otherwise, the installed curb stone is unqualified and there is no way to complete the acceptance, so you don't have to underestimate any building laying